The project involves the design and construction of two 10ML potable water storage tanks and 1.7km of DN900 MSCL pipelines, along with an access track, chemical dosing facility, and bulk earthworks on a greenfield site.
It will double the area’s drinking water storage, securing supply for up to 10,000 properties.
Engaged by Aqua Metro, Saunders is delivering the project under an expedited program, minimising disruption through close supply chain collaboration and concurrent tank construction.