Bendigo Water Treatment Plant – HBT Compliance Stage 2&3

Capability:

  • Fluid Storage & Transfer Infrastructure

Location:

Kangaroo Flat, VIC

The Bendigo WTP is located in the Kangaroo Flat area, South of Bendigo, and it supplies potable water to around 100,000 customers from the Sandhurst Reservoir via Bendigo’s Potable Water Distribution System. The plant, with a capacity of 126 ML/day, has been in service since 2002 and it is owned and operated by Veolia under a build-own-operate-transfer (BOOT) contract on behalf of Coliban Water.

The project is for the supply, installation and commission of a new UV Disinfection System and the construction of a Chlorine Contact concrete Tank including all civil, mechanical, electrical and control works:

  • Civil Earthwork and Site Preparation
  • Construction of a 40mL x 10mW x 6mH concrete tank
  • 4 UV reactors and building
  • 1200NB MSCL and 700NB SS piping

Control system upgrades including PLC and SCADA modifications.