The project involved the design and construction of a new 30 ML potable water storage tank to replace the existing 20 ML tank. The scope included the safe demolition and removal of the existing tank and associated infrastructure, followed by the decommissioning and removal of pipelines.
New MSCL pipework and valves were supplied and installed to support the upgraded system. Additionally, the existing drainage system was removed and replaced with a new one to accommodate the revised layout and capacity.
The project also delivered several infrastructure improvements, including the construction of a new crane pad, the installation of new asphalt pavement around the tank, and upgrades to unsealed access roads.
Electrical upgrades were undertaken to support the new infrastructure. This included the installation of a new SCADA system, updated telemetry, and reprogramming of the PLC to ensure full integration with the enhanced system. The electrical system was comprehensively updated to suit the requirements of the new infrastructure and improve overall operational reliability.