Saunders successfully delivered a critical infrastructure project as part of the Larrakeyah Defence Precinct Redevelopment Program (LDPRP), with Laing O’Rourke serving as the Managing Contractor.
The project involved the design and construction of four new bulk fuel storage tanks alongside the installation of:
Fuel quarantine and sampling systems
Offloading and dispensing filtration and pump stations
Electrical and instrumentation systems
Safety and process control systems
Saunders also connected these systems to site-wide piping and wharf hydrant lines at one of Australia’s major operational defence bases