by Saunders International | Jan 12, 2018
Diesel Tank Trafigura Hastings The Client Client: Trafigura Location: 88 Bayview Road, Hastings, VIC The Project Saunders was engaged as head contractor for the design, construction and commissioning of a 17.5 mega litre diesel tank. Tank design and construction Civil...
by Saunders International | Jan 12, 2018
Floor repair and roof installation BP Kwinana The Client Client: BP – BP Kwinana Refinery Location: Tank 310 – Mason Rd Kwinana Beach WA The Project Replacement of the floor, strake and roof plate of a 39 metre (diameter) x 16.5 metre (height) tank. Scope:...
by Saunders International | Jan 12, 2018
Tank repair and floor replacement Caltex Lytton The Client Client: Caltex Location: Lytton Refinery, Tank 2027, Brisbane, QLD The Project Decommission the tank, full floor replacement and floating roof repair of a 39.6 metre (diameter) x 14.6 metre (height) Naptha...
by Saunders International | Jan 12, 2018
Tank Foundation, Mobil, Noumea The Client Client: Mobil Location: Noumea The Project Major rework to 30 metre (diameter) x 18 metre (height) tank foundations. Scope: Assess condition of tank foundation Complete foundation repair method statement Transport all...
by Saunders International | Jan 6, 2018
Crude oil tank demolition and replacement Caltex Sydney The Client Client: Caltex Location: 2 Solander St, Kurnell, NSW The Project Saunders was engaged as head contractor for the demolition and of a crude oil tank and to replace it with new gasoline tank. Demolition...